DEMOThis website is a showcase demo built by Briefikir. Contact us for a gas installer website and project–service softwareBriefikir demo — contact us for this software

Service

Building riser installation

Main line, risers and meter banks for apartment buildings — including management consent and coordination with residents.

Overview

What we do

The riser is the first step for every flat in the building. We plan the riser route, meter bank and flat isolation valves together with the building management.

Residents are informed in advance; scaffolding and safety measures are included.

About 2 weeks for a 12-flat building

Scope

  • Main line and riser design
  • Management consent and documents
  • Meter bank and flat valves
  • Steel riser pipe, brackets, paint
  • Scaffolding and site safety
  • Riser test and distributor inspection
Building riser installation — 1Building riser installation — 2Building riser installation — 3